Select Page

Power UNITS FOR DOCK LEVELER

Special Notes
1. The electrical power unit is of S3 duty, which may only be worked intermittently,i.e. 1minute on and 9 minutes off.
2. Clean every one of the hydraulic elements concerned ahead of set up of the energy unit.
three. Viscosity from the hydraulic oil shoud be 15~46 cst, which ought to also be clean and cost-free of impurities, N46 hydraulic oil is advisable .
four. Check the oil level during the tank right after the original operation in the energy unit.
five. Oil changing is needed right after the preliminary one hundred operation hours, afterwards when every 3000 hours.

Energy UNITS FOR DOCK LEVELER 4
Common Description
This power unit is deigned for all those dock levellers which will need floating ramps with an emergency halt perform. The ramp will rise when the pump is operating.The lip will expend automatically once the ramp cylinder finishes its stroke. The ramp cylinder will retract once the pump stops operating. An emergency stop is going to be recognized though the solenoid valve is energized. The lowering pace of the two the ramp along with the lip is adjusted by the needle valves from the method.

Tags:

worm gear box

As one of leading worm gear boxes manufacturers, suppliers and exporters of products, We offer sworm gear box and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of worm gear box

Recent Posts